    Sorry for delay posting my project updates about two weeks, because i couldn't access google blogger when i was at home in the past two weeks. What i have done in last two weeks (2009/7/26 - 2009/8/10) are as follow:

    (1) I have resolved the ticket#1701.

    (2) Modify the occ's serialization, so that it can deal with the case that openmrs will only go one level for user object when do serialization.

    (3) Completed a part of importing similar concept work, now we can see the box having the similar concepts in it, the left work for me is that deseiralize from the string and save that similar concept into openmrs database.